No. | project name | Production scale | Transform main content or effect | cooperation method |
---|---|---|---|---|
1 | Huaxin Cement (Xinyang) Co., Ltd. Waste Heat Power Station | Design output 4500t/d Actual output 5000t/d SP inlet flue gas temperature: 306°C Power station installed: 9MW | Rebuild power generation load: 6130kW After the transformation of power generation load: 7500kW | BOT |
2 | Huaxin Cement (Zigui) Co., Ltd. Waste Heat Power Station | Design output 5000t/d Actual output 5400t/d SP inlet flue gas temperature: 310°C Power station installed: 9MW | Before the transformation of power generation load: 5300kW After the transformation of power generation load: 7500kW | Design, construction, commissioning, technical guidance services |
3 | Huaxin Cement (Tibet) Co., Ltd. Waste Heat Power Station 1#line | Design output 850t/d Actual output 1100t/d SP inlet flue gas temperature: 340°C | Before the transformation of power generation load: 5700kW After the transformation of power generation load: 6500kW | Design, construction, commissioning, technical guidance services |
4 | Huaxin Cement (Tibet) Co., Ltd. Waste Heat Power Plant 2#line | Design output 2000t/d Actual output 2200t/d SP inlet flue gas temperature: 310°C Power station installed: 7.5MW | Design, construction, commissioning, technical guidance services | |
5 | Huaxin Cement (Daye) Co., Ltd. Waste Heat Power Station 1#line | Design output 2500t/d Actual output 2700t/d SP inlet flue gas temperature: 330°C Power station installed: 4.5MW | Rebuild power generation load: 3100kW After the transformation of power generation load: 4000kW | Design, construction, commissioning, technical guidance services |
6 | Huaxin Cement (Daye) Co., Ltd. Waste Heat Power Station 2#line | Design output 5000t/d Actual output 5500t/d SP inlet flue gas temperature: 305°C Power station installed: 9MW | K2Before the transformation of power generation load: 6900kW K2After the transformation of power generation load: 8200kW | Design, construction, commissioning, technical guidance services |
7 | Huaxin Cement (Quxian) Co., Ltd. Waste Heat Power Station | Design output 4500t/d Actual output 5400t/d SP inlet flue gas temperature: 290°C Power station installed: 11.5MW | Before the transformation of power generation load: 7200kW After the transformation of power generation load: 7500kW | Design, construction, commissioning, technical guidance services |
8 | Tianjin Zhenxing Cement Co., Ltd. Thermal Power Station #1line | Design output 2000t/d Actual output 2400t/d SP inlet flue gas temperature: 305°C Power station installed: 4.5MW | Before the transformation of power generation load: 2812kW After the transformation of power generation load: to be debugged | Design, construction, commissioning, technical guidance services |
9 | Tianjin Zhenxing Cement Co., Ltd. Thermal Power Station #2line | Design output 2000t/d Actual output 2400t/d SP inlet flue gas temperature: 293°C Power station installed: 4.5MW | Rebuild power generation load: 3235kW After the transformation of power generation load: 3670kW | Design, construction, commissioning, technical guidance services |
10 | Nanyang Zhonglian Wolong Cement Co., Ltd. waste heat power station | Design output 3500t/d Actual output 4400t/d SP inlet flue gas temperature: 270°C Power station installed: 7.5MW | Before the transformation of power generation load: 5220kW (SP inlet flue gas temperature 310°C) After the transformation of power generation load: 6200kW (SP inlet flue gas temperature 270°C) | BOT |
11 | Beichuan Zhonglian | Design output 5000t/d Actual output 5700t/d SP inlet flue gas temperature: 290°C Power station installed: 9MW | Before the transformation of power generation load: 6900kW After the transformation of power generation load: 8050kW | Design, construction, technical consulting |
12 | Cambodia Zhuoringding Cement Co., Ltd. | New line | Machine linkage debugging and partial installation | Construction and technical consultation |
13 | Huaxin Cement (Yangxin) Co., Ltd. Waste Heat Power Station 1#line | Design output 5500t/d Actual output 5040t/d (burnt garbage) Power station installed: 9MW | Power generation before transformation: 13775kW After the transformation of power generation load: 15850kW | Design, construction, commissioning, technical guidance services |
14 | Huaxin Cement (Yangxin) Co., Ltd. Waste Heat Power Station 2#line | Design output 5500t/d Actual output 5177t/d (burnt garbage) Power station installed: 9MW | Design, construction, commissioning, technical guidance services | |
15 | Anqiu Shanshui Cement Co., Ltd. | 1#,2#Superheater anti-blockage modification | The structure of the heating surface was changed and the heated area was recalculated. The superheater basically did not block. | Design, construction, commissioning, technical guidance services |
16 | Huaxin Cement (Red River) Co., Ltd. K5 | Design output 2500t/d Actual output 2400t/d SP inlet flue gas temperature: 325°C Power station installed: 4.5MW | Power generation before renovation: 2412kW After the transformation of power generation load: 2850kW | Design, construction, commissioning, technical guidance services |
17 | Yishui Shanshui Cement Co., Ltd. | Superheater anti-blockage modification | The structure of the heating surface was changed and the heated area was recalculated. The superheater basically did not block. | Design, construction, commissioning, technical guidance services |
18 | Taishan Zhonglian Cement Co., Ltd. | Boiler air intake optimization, boiler thermal system reform | Before the transformation of power generation load: 8500kW After the transformation of power generation load: 10000kW | Design, construction, commissioning, technical guidance services |
19 | Dongping Zhonglian Cement Co., Ltd. | Kiln-boiler lowering resistance modification, steam pipeline resistance reduction reform | Boiler system resistance reduced by 400Pa | Design, construction, commissioning, technical guidance services |
20 | Zaozhuang Shanshui Cement Co., Ltd. | Condenser Heat Exchange Area Expansion Expansion | Remodeled area by 1250Squared to 1600 square feet, vacuum increased by 2KPa | Design, construction, commissioning, technical guidance services |
21 | Guangxi Lantian Power Generation Co., Ltd. | Boiler Heating Surface Modification | Reduce tube resistance, recalculate heat transfer area, adjust heating surface | Design, construction, commissioning, technical guidance services |
22 | Huaxin Cement (Quxian) Co., Ltd. | 1#,2#Superheater anti-blockage modification | The structure of the heating surface was changed and the heated area was recalculated. The superheater basically did not block. | Design, construction, commissioning, technical guidance services |
23 | Huaxin Cement (Yangxin) Co., Ltd. Waste Heat Power Station 2#line | Design output 5500t/d Actual output 5040t/d (burnt garbage burning petroleum coke) Power station installed: 9MW | Boiler air intake optimization and resistance reduction. Rebuild power generation load: 7500kW After the transformation of power generation load: 8500kW | Design, construction, commissioning, technical guidance services |
24 | Huaxin Cement (Wuxue) Co., Ltd. Waste Heat Power Station 2#line | Design output 5500t/d Actual output 5177t/d (burnt garbage) Power station installed: 9MW | processing | Design, construction, commissioning, technical guidance services |
25 | Sinoma Pingxiang Cement Co., Ltd. 1#line | Design output 2500t/d Actual output 2800t/d SP inlet flue gas temperature: 330°C | The reform of the boiler thermal system and the addition of superheaters are underway. | Design, construction, commissioning, technical guidance services |
26 | Sinoma Pingxiang Cement Co., Ltd. 2#line | Design output 5000t/d Actual output 5500t/d SP inlet flue gas temperature: 330°C Power station installed: 9MW | Design, construction, commissioning, technical guidance services |