Waste Heat Power Generation Upgrade Solution

        At present, waste heat power stations have frequent safety accidents, inefficient use of energy, and serious environmental pollution, threatening people's life and property safety and healthy living environment.
       
       Shandong believes in safety production as the main line, through comprehensive investigation of the company's production conditions and production processes, combined with the original design technology program, through the company's independent development of thermal system calculation software model for accounting, analysisThe maximum working capacity of the process system and the best operating state of the process, and the construction of a safe, efficient, environmentally friendly, energy-saving waste heat power station production system.

Related technologies

 Grate cooler distribution
Under the conditions of ensuring high-quality, safe and high-quality operation of the kiln, clinker cooling is ensured. Through the adjustment of the air distribution of the grate cooler fan and the rational use of wind in the kiln process, heat is increased as much as possible for the waste heat power generation wind.
 
 Thermal system optimization
Through the thermal system calculation software, the original boiler heating surface is adjusted, and the original thermal system is optimized to fully and efficiently utilize the waste heat resources.Through the transformation projects completed by the company, the company's unique technological transformation technology has been formed.

 Grate cooler circulation wind technology
The grate cooler circulating air technology is to recover the heat of 80~100°C flue gas discharged from the existing kiln-head AQC boiler, and is combined with the grate cooler clinker cooling technology. It is the existing waste heat power generation technology transformation to improve the power generation load.An effective way, especially to overcome the low external environment in winter, to reduce the impact of power generation load effective measures.
The recirculating wind technology looks simple, but it still has some technical difficulties. At present, the success rate of projects that other companies have rebuilt is only about 70%. Our company specially arranged technical personnel to conduct inspections and public relations, and now our successful recirculation wind reform is successful.The rate has basically reached 100%, and several projects that have been transformed have all been successful.
 
 Kiln shell waste heat reuse technology
Through the high-efficiency counter-current heat radiation recovery heat exchanger designed by our company, the radiant heat of the rotary kiln barrel body is fully utilized, and the overall heat conversion can effectively meet the cement plant winter heating and the use of domestic hot water, and has been widely promoted.In addition, the heat recovered by the use of a rotary kiln heat shield is used in the summer and refrigeration technology is being tested and promoted.
 
 Recirculating water efficient pump optimization system:
Using fluid transport technology to systematically analyze and study the test data, combine the fluid dynamics characteristics of the system, design energy-saving technological transformation programs, and design the energy-saving technological transformation program by correcting the unfavorable factors existing in the system, and according to the best working condition parameters.Customized “high-efficiency energy-saving pumps” replace the pumps that are currently in unfavorable operating conditions and operate at low efficiency, eliminating “inefficient energy consumption”, improving transmission efficiency, and achieving the best energy-saving effect.
 
 High efficiency vacuum system
The WFQL-350-Y high-efficiency vacuum pumping system replaces the original jet air ejector, jet water vacuum deaerator and ejector steam ejector, saving electricity, saving water, and saving energy under the same operating conditions.The water benefits are obvious and the system is optimized.
 
 
 

Waste Heat Power Station Upgraded Power Generation Technical Transformation Partial Performance Table

No. project name Production scale Transform main content or effect cooperation method
1 Huaxin Cement (Xinyang) Co., Ltd. Waste Heat Power Station Design output 4500t/d
Actual output 5000t/d
SP inlet flue gas temperature: 306°C
Power station installed: 9MW
Rebuild power generation load: 6130kW
After the transformation of power generation load: 7500kW
BOT
2 Huaxin Cement (Zigui) Co., Ltd. Waste Heat Power Station Design output 5000t/d
Actual output 5400t/d
SP inlet flue gas temperature: 310°C
Power station installed: 9MW
Before the transformation of power generation load: 5300kW
After the transformation of power generation load: 7500kW
Design, construction, commissioning, technical guidance services
3 Huaxin Cement (Tibet) Co., Ltd. Waste Heat Power Station 1#line Design output 850t/d
Actual output 1100t/d
SP inlet flue gas temperature: 340°C
Before the transformation of power generation load: 5700kW
After the transformation of power generation load: 6500kW
Design, construction, commissioning, technical guidance services
4 Huaxin Cement (Tibet) Co., Ltd. Waste Heat Power Plant 2#line Design output 2000t/d
Actual output 2200t/d
SP inlet flue gas temperature: 310°C
Power station installed: 7.5MW
Design, construction, commissioning, technical guidance services
5 Huaxin Cement (Daye) Co., Ltd. Waste Heat Power Station 1#line Design output 2500t/d
Actual output 2700t/d
SP inlet flue gas temperature: 330°C
Power station installed: 4.5MW
Rebuild power generation load: 3100kW
After the transformation of power generation load: 4000kW
Design, construction, commissioning, technical guidance services
6 Huaxin Cement (Daye) Co., Ltd. Waste Heat Power Station 2#line Design output 5000t/d
Actual output 5500t/d
SP inlet flue gas temperature: 305°C
Power station installed: 9MW
K2Before the transformation of power generation load: 6900kW
K2
After the transformation of power generation load: 8200kW
Design, construction, commissioning, technical guidance services
7 Huaxin Cement (Quxian) Co., Ltd. Waste Heat Power Station Design output 4500t/d
Actual output 5400t/d
SP inlet flue gas temperature: 290°C
Power station installed: 11.5MW
Before the transformation of power generation load: 7200kW
After the transformation of power generation load: 7500kW
Design, construction, commissioning, technical guidance services
8 Tianjin Zhenxing Cement Co., Ltd. Thermal Power Station #1line Design output 2000t/d
Actual output 2400t/d
SP inlet flue gas temperature: 305°C
Power station installed: 4.5MW
Before the transformation of power generation load: 2812kW
After the transformation of power generation load: to be debugged
Design, construction, commissioning, technical guidance services
9 Tianjin Zhenxing Cement Co., Ltd. Thermal Power Station #2line Design output 2000t/d
Actual output 2400t/d
SP inlet flue gas temperature: 293°C
Power station installed: 4.5MW

Rebuild power generation load: 3235kW
After the transformation of power generation load: 3670kW
Design, construction, commissioning, technical guidance services
10 Nanyang Zhonglian Wolong Cement Co., Ltd. waste heat power station Design output 3500t/d
Actual output 4400t/d
SP inlet flue gas temperature: 270°C
Power station installed: 7.5MW
Before the transformation of power generation load: 5220kW
(SP inlet flue gas temperature 310°C)
After the transformation of power generation load: 6200kW
(SP inlet flue gas temperature 270°C)
BOT
11 Beichuan Zhonglian Design output 5000t/d
Actual output 5700t/d
SP inlet flue gas temperature: 290°C
Power station installed: 9MW

Before the transformation of power generation load: 6900kW
After the transformation of power generation load: 8050kW
Design, construction, technical consulting
12 Cambodia Zhuoringding Cement Co., Ltd. New line Machine linkage debugging and partial installation Construction and technical consultation
13 Huaxin Cement (Yangxin) Co., Ltd. Waste Heat Power Station 1#line Design output 5500t/d
Actual output 5040t/d (burnt garbage)
Power station installed: 9MW
Power generation before transformation: 13775kW
After the transformation of power generation load: 15850kW
Design, construction, commissioning, technical guidance services
14 Huaxin Cement (Yangxin) Co., Ltd. Waste Heat Power Station 2#line Design output 5500t/d
Actual output 5177t/d (burnt garbage)
Power station installed: 9MW
Design, construction, commissioning, technical guidance services
15 Anqiu Shanshui Cement Co., Ltd. 1#,2#Superheater anti-blockage modification The structure of the heating surface was changed and the heated area was recalculated. The superheater basically did not block. Design, construction, commissioning, technical guidance services
16 Huaxin Cement (Red River) Co., Ltd. K5 Design output 2500t/d
Actual output 2400t/d
SP inlet flue gas temperature: 325°C
Power station installed: 4.5MW
Power generation before renovation: 2412kW
After the transformation of power generation load: 2850kW

 
Design, construction, commissioning, technical guidance services
17 Yishui Shanshui Cement Co., Ltd. Superheater anti-blockage modification The structure of the heating surface was changed and the heated area was recalculated. The superheater basically did not block. Design, construction, commissioning, technical guidance services
18 Taishan Zhonglian Cement Co., Ltd. Boiler air intake optimization, boiler thermal system reform Before the transformation of power generation load: 8500kW
After the transformation of power generation load: 10000kW
Design, construction, commissioning, technical guidance services
19 Dongping Zhonglian Cement Co., Ltd. Kiln-boiler lowering resistance modification, steam pipeline resistance reduction reform Boiler system resistance reduced by 400Pa Design, construction, commissioning, technical guidance services
20 Zaozhuang Shanshui Cement Co., Ltd. Condenser Heat Exchange Area Expansion Expansion Remodeled area by 1250Squared to 1600 square feet, vacuum increased by 2KPa Design, construction, commissioning, technical guidance services
21 Guangxi Lantian Power Generation Co., Ltd. Boiler Heating Surface Modification Reduce tube resistance, recalculate heat transfer area, adjust heating surface Design, construction, commissioning, technical guidance services
22 Huaxin Cement (Quxian) Co., Ltd. 1#,2#Superheater anti-blockage modification The structure of the heating surface was changed and the heated area was recalculated. The superheater basically did not block. Design, construction, commissioning, technical guidance services
23 Huaxin Cement (Yangxin) Co., Ltd. Waste Heat Power Station 2#line Design output 5500t/d
Actual output 5040t/d (burnt garbage burning petroleum coke)
Power station installed: 9MW
Boiler air intake optimization and resistance reduction.
Rebuild power generation load: 7500kW
After the transformation of power generation load: 8500kW
Design, construction, commissioning, technical guidance services
24 Huaxin Cement (Wuxue) Co., Ltd. Waste Heat Power Station 2#line Design output 5500t/d
Actual output 5177t/d (burnt garbage)
Power station installed: 9MW
processing Design, construction, commissioning, technical guidance services
25 Sinoma Pingxiang Cement Co., Ltd. 1#line Design output 2500t/d
Actual output 2800t/d
SP inlet flue gas temperature: 330°C
The reform of the boiler thermal system and the addition of superheaters are underway. Design, construction, commissioning, technical guidance services
26 Sinoma Pingxiang Cement Co., Ltd. 2#line Design output 5000t/d
Actual output 5500t/d
SP inlet flue gas temperature: 330°C
Power station installed: 9MW
Design, construction, commissioning, technical guidance services
 
       
 
 

E-mail Subscriptions

Shandong Shenxin Energy Saving and Environmental Protection Technology Co., Ltd. was established in July 2014 with a registered capital of 10 million yuan. The company is a company that is full of vigor and vitality, strong corporate culture compatibility, and rapid absorption and integration of advanced concepts.

about us

Shandong Shenxin Energy Saving and Environmental Protection Technology Co., Ltd. was established in July 2014 with a registered capital of 10 million yuan. The company is a company that is full of vigor and vitality, strong corporate 

Products center

Quick Links

contact us

address:Dingzhuang, Jiehe Town, Tengzhou City, Zaozhuang City, Shandong Province, Shandong Province, China
mailbox: xuxing5957@sina.com
phone:86-0632-2723258
Mobile phone:13563223857
 
节 2018 Shandong is convinced of energy conservation and environmental protection technology Co., Ltd.Lu ICP No. 14021212 -1